In short: Construction cost estimates, CSI material takeoffs and bid prep across all 50 US states and ZIP codes. 24–48h delivery, flat fee from $80. Free quote.

The Construction Bid Estimating Engine

In short: We calibrate architectural, structural, MEP, and civil drawings against all 31,910 US postal ZIP codes to prevent bid busting. Get unlocked CSI Divisions 01–48 Excel takeoffs and color-coded markups delivered in 24–48 hours with flat fees starting from $80.

View Sample BOQ

Built by senior CSI estimators · 5,400+ US bids delivered · Updated

CSI 01–48 Bid Verification Flow
Div 26–28 · 24–48h

Houston, TX (Harris County)

Index 90.4 · Est. fee $155–$225

Estimates delivered
5,400+
Since 2011 across US markets
Standard delivery
24–48h
12–24h rush desk available
Starting flat fee
$80
Firm quote within 15 minutes
US postal calibration
31,910
5-digit ZIP wage & freight indices

Outsourced bid desk for commercial contractors across the United States

Verified GC & MEP trade partners
  • Encore Electric
  • HELIX Electric LLC
  • Stones River Electric
  • Zapco Electric LLC
  • Aguila Electrical Services

CSI MasterFormat 01–48 · 286 Scopes

How do our 22 specialized trade estimating teams cover every CSI division?

Your electrical takeoff is built by an Accubid electrical estimator rather than a generalist. Choose any of our 22 trade divisions or 286 specialized construction takeoff scopes, each priced to your 5-digit US project ZIP code.

Trade desks
22
Takeoff scopes
286
Flat fee from
$80
Standard delivery
24–48h

MEP & life-safety systems

Electrical, mechanical, HVAC, plumbing, and fire protection takeoffs priced with NECA, MCAA, and ZIP-indexed crew labor.

Structure & building envelope

Concrete, masonry, steel, framing, roofing, and glazing quantities measured sheet by sheet against structural drawings.

Interiors, finishes & specialties

Drywall, flooring, coatings, and specialty systems takeoffs with waste factors and finish schedules built in.

Site, civil & industrial

Earthwork, paving, utilities, demolition, and process-plant estimates with equipment hours and haul calculations.

Don't see your exact scope?

A chief estimator prices custom CSI scopes and mixed-trade packages within 15 minutes.

Browse all 286 scopes

What your unlocked CSI Excel deliverable includes

Every formula stays editable so your team can swap supplier quotes, adjust crew hourly rates, or revise overhead and profit on bid morning.

Excerpt · Commercial core & MEP takeoff calibrated to ZIP 77002 (Houston, Harris County, TX · index 91.4)
CSI code Scope item & specification Takeoff qty Unit rate Line total
03 30 53 6" reinforced slab-on-grade (4,000 PSI, 15-mil vapor barrier, laser screed) 28,500 SF $7.28 $207,480
05 12 23 ASTM A992 structural wide-flange framing with 12% connections and erection 84 TON $3,885.00 $326,340
07 54 23 60-mil TPO mechanically attached membrane with R-30 tapered polyiso 285 SQ $814.00 $231,990
23 31 13 SMACNA 2" WG galvanized rectangular ductwork with hangers and sealer 16,400 LB $7.18 $117,752
26 24 13 2000A 480Y/277V main switchboard, EMT feeder conduit, and copper conductors 1 LS $94,620.00 $94,620

Paired with color-coded Bluebeam and PlanSwift PDF takeoff markups for fast PM audit

Inspect sample workbook
Pricing

How does flat-fee takeoff pricing work for bid week?

One firm upfront fee. Zero percentage-of-bid markups. Pick the takeoff package that fits your project scope.

Single-Trade Takeoff
$80$250starting flat fee

Per bid. 24–48h delivery. Zero % markups.

  • Included: Itemized CSI division quantities & waste
  • Included: 5-digit US ZIP crew labor & material rates
  • Included: Color-coded PDF takeoff markup drawings
  • Not in single-trade tier: Full multi-trade CSI Divisions 01–48 BOQ
  • Not in single-trade tier: Chief estimator buyout & discrepancy call
Best Value
Full GC + Multi-Trade BOQ
$280$850starting flat fee

Per bid package. 24–48h. Best bid-week value.

  • Included: Itemized CSI division quantities & waste
  • Included: 5-digit US ZIP crew labor & material rates
  • Included: Color-coded PDF takeoff markup drawings
  • Included: Full multi-trade CSI Divisions 01–48 BOQ
  • Included: Chief estimator buyout & discrepancy call

Bidding 10–25+ projects a month? Reserve a dedicated monthly senior estimator from $1,850/mo.

All 22 division rates
Interactive D3 regional benchmark · 100.0 US baseline

How does our US state construction labor & material cost index work?

Filter by region or cost driver and select any state bar to inspect crew hourly benchmarks, prevailing-wage rules, and 5-digit postal coverage.

US Baseline

100.0

National avg

Peak Coastal

128.9

HI (+28.9%)

Rural Low

86.9

MS (-13.1%)

Postal Index

31,910

5-digit ZIPs

Metric:
51 of 51 states

Weighted average of trade labor, material freight, and tax burdens

Click or use ↑↓ arrows to inspect any jurisdiction Selected Regional Market

What do our chief estimator field guides cover?

Takeoff verification protocols and CSI division assembly notes

All 25 guides

Frequently Asked Questions (FAQ)

Frequently Asked Questions (FAQ) for Bidding Contractors

Pricing, CSI MasterFormat deliverables, ZIP-code wage calibration, and turnaround windows

How fast will I receive my quote and completed construction estimate?
Once you upload your PDF/CAD drawings or email a plan link to info@professionalestimatingllc.com, a senior estimator reviews the sheet count and replies within 15 minutes with a firm flat-fee quote. Standard takeoffs and cost estimates are delivered in 24–48 hours, with 12–24 hour overnight rush service available for urgent bid deadlines.
How do you calibrate labor and material costs to my exact US ZIP code?
We never apply generic national averages. Every line item is indexed to your 5-digit US project ZIP code—incorporating local union collective bargaining or merit-shop crew wages, state prevailing wage (Davis-Bacon) rules when applicable, regional freight factors, and current supply-house material pricing.
What exact files are included in my bid-ready estimating package?
You receive (1) a 100% unlocked, formula-driven Microsoft Excel workbook organized by CSI MasterFormat divisions with separate Material, Labor Hours, Labor Rate, Equipment, and Overhead/Profit columns; (2) color-coded PDF takeoff markup drawings showing every counted fixture, linear run, and area; and (3) a clean vendor BOM tab plus bid inclusions/exclusions notes.
How much does a construction takeoff or cost estimate cost?
Single-trade residential or light-commercial takeoffs start at a flat $80. Typical commercial subcontractor bids range from $120 to $550, and full multi-trade CSI Divisions 01–48 general contractor estimates typically range from $350 to $1,250. We never charge a percentage of your project value.
Are my bid drawings and pricing kept strictly confidential?
Yes. Every drawing package is protected under strict non-disclosure protocols. We never share your takeoff quantities or pricing with competing bidders on the same project, and we execute custom mutual NDAs immediately upon request.

How to request a firm takeoff quote in 15 minutes?

Flat fee from $80 · 24–48h delivery · NDA protected

Plans and bid details received

A senior CSI estimator is reviewing your project ZIP code and scope now. Expect your firm flat-fee quote within 15 minutes.

Mutual NDA executed on request

Search 31,910 US ZIP codes, cities & counties

Control how Professional Estimating LLC stores session diagnostics and local project ZIP settings.

Required for plan upload security, spam protection, offline service worker caching, and storing your privacy choice. Never stores personal data.

Helps us measure page speed and improve our US ZIP cost lookup interface via Microsoft Clarity Consent v2. Disabled by default until accepted.

Remembers your last calibrated 5-digit US project ZIP code so quote forms and crew rate tables stay pre-filled across visits.