Construction Estimating & Material Takeoffs in Albany, NY
Win more residential, commercial, civil, and industrial bids in Albany, New York (Albany County) with CSI Divisions 01–48 quantity takeoffs calibrated to local ZIP 12202 crew wages (123.6 cost index). 24–48 hour delivery, flat fee from $80.
Albany Bid Metrics
- Primary USPS ZIP
- 12202
- City Labor Index
- 137.2
- Material Index
- 107
- Composite Index
- 123.6
- GPS Reference
- 42.641, -73.764
Albany, NY Calibrated Construction Assembly Benchmarks
Installed commercial cost benchmarks adjusted by Albany’s 1.24x local composite multiplier.
| CSI Code | Commercial Construction Assembly | Unit | Albany Installed Rate | Trade Takeoff Link |
|---|---|---|---|---|
| 03 30 53 | 6" Reinforced Industrial Slab-on-Grade (4,000 PSI + Vapor Barrier) | SF | $9.83 / SF | Concrete Takeoff |
| 05 12 23 | ASTM A992 Structural Wide-Flange Framing (Fab + Erected) | TON | $5253 / TON | Steel Takeoff |
| 07 54 23 | 60-Mil TPO Roof System + R-30 Polyiso Tapered Insulation | SQ | $1100 / SQ | Roofing Takeoff |
| 09 29 00 | 1-Hr UL Metal Stud & 5/8" Type X Drywall Partition (Level 4) | SF | $12.67 / SF | Drywall Takeoff |
| 23 31 13 | SMACNA 2" WG Galvanized Rectangular HVAC Ductwork | LB | $9.70 / LB | HVAC Takeoff |
| 26 05 33 | Commercial 480V Power Distribution, EMT Conduit & LED Package | SF | $24.23 / SF | Electrical Takeoff |
Albany Code & Permitting Context
NYC Building Code & Local Law 97 carbon caps in the 5 Boroughs; NYS Uniform Fire Prevention and Building Code across Upstate & Long Island.
NYC DOB Chapter 33 sidewalk sheds/cocoon netting, night/weekend freight-elevator hoist rules, Manhattan schist rock excavation, and Upstate lake-effect snow.
Albany County Labor & Active Sectors
NY Labor Law §220 (public works) & §224-a (covered private projects receiving public subsidies) enforce top-tier union rates.