Primary ZIP 26101 · Wood County, WV
Construction Estimating & Material Takeoffs in Parkersburg, WV
Win more residential, commercial, civil, and industrial bids in Parkersburg, West Virginia (Wood County) with CSI Divisions 01–48 quantity takeoffs calibrated to local ZIP 26101 crew wages (94.4 cost index). 24–48 hour delivery, flat fee from $80.
Parkersburg Bid Metrics
- Primary USPS ZIP
- 26101
- City Labor Index
- 91.2
- Material Index
- 98.2
- Composite Index
- 94.4
- GPS Reference
- 39.264, -81.535
Parkersburg, WV Calibrated Construction Assembly Benchmarks
Installed commercial cost benchmarks adjusted by Parkersburg’s 0.94x local composite multiplier.
| CSI Code | Commercial Construction Assembly | Unit | Parkersburg Installed Rate | Trade Takeoff Link |
|---|---|---|---|---|
| 03 30 53 | 6" Reinforced Industrial Slab-on-Grade (4,000 PSI + Vapor Barrier) | SF | $7.50 / SF | Concrete Takeoff |
| 05 12 23 | ASTM A992 Structural Wide-Flange Framing (Fab + Erected) | TON | $4012 / TON | Steel Takeoff |
| 07 54 23 | 60-Mil TPO Roof System + R-30 Polyiso Tapered Insulation | SQ | $840 / SQ | Roofing Takeoff |
| 09 29 00 | 1-Hr UL Metal Stud & 5/8" Type X Drywall Partition (Level 4) | SF | $9.68 / SF | Drywall Takeoff |
| 23 31 13 | SMACNA 2" WG Galvanized Rectangular HVAC Ductwork | LB | $7.41 / LB | HVAC Takeoff |
| 26 05 33 | Commercial 480V Power Distribution, EMT Conduit & LED Package | SF | $18.50 / SF | Electrical Takeoff |
Parkersburg Code & Permitting Context
West Virginia State Building Code (87 CSR 4 — IBC, NEC, IPC, IMC, IECC) administered via State Fire Commission.
Steep Appalachian bench-cut earthwork, rock nails/gabion retaining walls, mine-subsidence grouting, and Kanawha Valley chemical process specs.
Wood County Labor & Active Sectors
State prevailing wage repealed; industrial union craft agreements remain widespread in Ohio/Kanawha river valleys.
Chemical, Polymer & Battery-Storage Manufacturing
Natural Gas Midstream & Power
Regional Healthcare & WVU Campuses
Corridor H Heavy Civil/Bridges
22 CSI Trade Estimating Services Serving Parkersburg, WV
General Construction (Div 01–48)
Electrical (Div 26–28)
Mechanical (Div 23 & 40)
HVAC (Div 23)
Plumbing (Div 22)
MEP Combined (Div 21, 22, 23, 26–28)
Fire Protection (Div 21 & 28)
Concrete (Div 03)
Masonry (Div 04)
Structural Steel (Div 05)
Carpentry & Wood (Div 06)
Roofing & Siding (Div 07)
Drywall & Insulation (Div 07 & 09)
Flooring (Div 09)
Painting & Coatings (Div 09 & 07)
Doors, Windows & Glazing (Div 08)
Excavation & Sitework (Div 31)
Civil & Infrastructure (Div 32–33)
Landscaping & Hardscape (Div 32)
Specialty & Technology (Div 10–14, 27–28, 48)
Demolition & Restoration (Div 02)
Industrial & Process (Div 40–46)