ZIP Code 02108 Construction Cost Estimating & Crew Wage Index (Boston, MA)
Bid-ready CSI MasterFormat Divisions 01–48 material takeoffs and labor cost estimates calibrated directly to postal code 02108 in Boston, Suffolk County, Massachusetts. Delivered in unlocked Excel + color PDF takeoff layers within 24–48 hours, flat fee from $80.
ZIP 02108 Calibration Card
- Jurisdiction
- Suffolk County
- ZIP Labor Index
- 130.1
- Material Freight Index
- 105.5
- Composite Multiplier
- 1.19x (119)
- Coordinates
- 42.3576, -71.0684
ZIP 02108 (Boston, MA) Burdened Trade Labor & CSI Assembly Rates
Calibrated for Strong Union / Prevailing Wage bidding in Suffolk County (130.1 labor factor).
| CSI Division | Trade & Benchmark Assembly | ZIP 02108 Crew Rate | ZIP Installed Unit Cost | Flat Takeoff Fee |
|---|---|---|---|---|
| Div 26 | Commercial Electrical Distribution & LED Package | $102.13/hr | $23.32/SF | From $85 |
| Div 23 | Packaged VAV RTU + SMACNA Galvanized Ductwork | $97.31/hr | $26.66/SF | From $85 |
| Div 22 | Cast-Iron DWV + Type L Copper Domestic Plumbing | $99.14/hr | $11.66/SF | From $85 |
| Div 03 | 4,000 PSI Footings & Slab-on-Grade w/ Grade 60 Rebar | $84.43/hr | $283.22/CY | From $80 |
| Div 05 | A992 Wide-Flange Structural Steel + Metal Decking | $103.30/hr | $5058/TON | From $90 |
| Div 09 | Metal Stud Framing, Type X Gypsum & ACT Ceilings | $86.52/hr | $12.20/SF | From $80 |
| Div 31 | 3D GPS Mass Grading, Trenching & Select Structural Fill | $93.80/hr | $41.05/CY | From $95 |
MA Building & NEC Code Notes
Massachusetts State Building Code (780 CMR), 527 CMR Electrical Code, 248 CMR Massachusetts Uniform Plumbing Code, and Specialized Stretch Energy Code.
Site & Environmental Scope Factors
48-inch frost lines, Back Bay/Seaport slurry-wall & tieback excavation, lab 100% OA heat-recovery systems, and Passive House stretch envelopes.
Prevailing Wage Rules in ZIP 02108
Massachusetts Prevailing Wage Law (M.G.L. c. 149, §§26–27) strictly covers all municipal and state public construction.