ZIP Code 93650 Construction Cost Estimating & Crew Wage Index (Fresno, CA)
Bid-ready CSI MasterFormat Divisions 01–48 material takeoffs and labor cost estimates calibrated directly to postal code 93650 in Fresno, Fresno County, California. Delivered in unlocked Excel + color PDF takeoff layers within 24–48 hours, flat fee from $80.
ZIP 93650 Calibration Card
- Jurisdiction
- Fresno County
- ZIP Labor Index
- 136.1
- Material Freight Index
- 108.3
- Composite Multiplier
- 1.24x (123.6)
- Coordinates
- 36.8411, -119.8010
ZIP 93650 (Fresno, CA) Burdened Trade Labor & CSI Assembly Rates
Calibrated for Strong Union / Prevailing Wage bidding in Fresno County (136.1 labor factor).
| CSI Division | Trade & Benchmark Assembly | ZIP 93650 Crew Rate | ZIP Installed Unit Cost | Flat Takeoff Fee |
|---|---|---|---|---|
| Div 26 | Commercial Electrical Distribution & LED Package | $106.84/hr | $24.23/SF | From $85 |
| Div 23 | Packaged VAV RTU + SMACNA Galvanized Ductwork | $101.80/hr | $27.69/SF | From $85 |
| Div 22 | Cast-Iron DWV + Type L Copper Domestic Plumbing | $103.71/hr | $12.11/SF | From $85 |
| Div 03 | 4,000 PSI Footings & Slab-on-Grade w/ Grade 60 Rebar | $88.33/hr | $294.17/CY | From $80 |
| Div 05 | A992 Wide-Flange Structural Steel + Metal Decking | $108.06/hr | $5253/TON | From $90 |
| Div 09 | Metal Stud Framing, Type X Gypsum & ACT Ceilings | $90.51/hr | $12.67/SF | From $80 |
| Div 31 | 3D GPS Mass Grading, Trenching & Select Structural Fill | $98.13/hr | $42.64/CY | From $95 |
CA Building & NEC Code Notes
California Building Standards Code (Title 24 Parts 1–12), CALGreen, OSHPD/HCAI healthcare, DSA schools, and strict Title 24 Part 6 energy controls.
Site & Environmental Scope Factors
CBC Seismic Design Category D/E moment frames & MEP seismic bracing, WUI wildfire ignition-resistant exteriors, and all-electric reach codes.
Prevailing Wage Rules in ZIP 93650
California DIR Prevailing Wage + Project Labor Agreements (PLAs) mandatory on public works and select subsidized private developments.